|
Signage Regulations Ridgefield, CT
|
|
Ridgefield Town Hall Planning and Zoning 66 Prospect Street Ridgefield, CT P&Z Hours; Monday - Friday 8:00AM - 4:00PM
|
|
Ridgefield CT Website
|
|
|
Ridgefield Sign Permit Process
|
|
Architectural Review Checklist 1. Fill out/submit AAC forms. Application Form bearing the original signature(s) of the owner(s)of record, or signature of an Authorized Agent, with letter of authorization from the property owner. 2. A statement describing in detail the proposed project or activity. 3. Where applicable, three (3) copies of a scaled drawing showing the design of any proposed SIGN: - dimensions (length, width, height) - drawing of sign design and content - colors of sign - materials for construction - site plan showing location of proposed free-standing sign - building elevations showing location and proportions of wall signs 4. Get scheduled for and attend the AAC review meeting (2nd and 4th Tuesday of the month, 7 to 10PM) 5. If approved, take approval documents to zoning and building department to apply/pay for permits. 6. Once permits are received, THEN (and only then) can production/construction begin on the sign.
|
|
To print out the checklist, click on the document icon
|
|
|
Link to town signage regulations Section 7.2(C)
|
|
|
AAC Checklist
|
|
|
AAC Schedule
|
|
|
|
|