Four more of the trees donated by Lowe's were planted in the front. The planting bed was covered with weed block fabric to keep maintenance to a minimum. Garage doors were installed. In the coming week, garage ceiling sheetrock, interior and exterior light fixtures, switches and outlets will be installed, closet interiors will be finished, doors and door hardware will be placed. Gutters will be finished. In two weeks our Construction Supervisor will request the Certificate of Occupancy inspection. Our volunteers are focused on completing the homes because the dedication ceremony, home blessings and open house are scheduled for October 29 from 4 to 6 pm.
|
|